1 of 3

There is no value without innovation. We are different from others!

  • Adjustable angle bunion corrector

    R&D cycle: 8 months
    Time to market: 2021, Innovation: The first to use knob adjustment and staged correction (0°, 7.5°, 15°)

  • Inflatable Cervical Traction device

    R&D cycle: 6 months
    Time to market: 2021, Innovation: The first high front and low back head-up design, an innovative balanced structure with a small top and a large bottom.

  • Energy Moxibustion Cup

    R&D cycle: 14 months
    Time to market: 2018, Innovation: Traditional Chinese medicine open fire moxibustion, using heat-collecting structure to make the temperature more concentrated.

  • Varicose veins Air Compression Leg Wraps

    R&D cycle: 8 months
    Time to market: 2021, Innovations: Invisible wearable design like socks, Intelligent cycle charging and deflating massage

  • Tens + Hot Compress + Air Pressure Lumbar Traction Device

    R&D cycle: 26 months
    Time to market: 2019, Innovation: 1.5cm initial height design, making it easier for patients with back pain to lie down, and the surface is made of soft fabric instead of hard plastic.

  • Top pressure point and Back Stretcher

    R&D cycle: 13 months
    Time to market: 2020, Innovation: People with back pain will have strain pain points, and the movable top pressure column combined with the dynamic airbag can massage the painful strain points

  • Leg heat vibration massager

    R&D cycle: 4 months
    Time to market: 2017, Innovation: A portable leg massager that combines air pressure + heat + vibration

  • X-shaped thin and lightweight back brace

    R&D cycle: 11 months
    Time to market: 2022, Innovation: In order to solve the problem of elastic, light and breathable fabric, we repeated the sampling more than 30 times, and we are the first in the industry to use 430g fabric to make back brace.

1 of 8

A research and development team with an innovative gene

Founded in 2013, Mone Technology's team consists of the industry's best industrial designers and mechanical and structural engineers, who utilize their outstanding talent and rich experience to create highly competitive products for our customers.

They are guided by a new product development philosophy of “Micro-innovation + Emotional Value + User Experience” to provide customers with innovative products with commercial value. At the same time, they are committed to bringing valuable product concepts to life and developing avant-garde and innovative home health products for consumers.

  • 1-2 Days

    Just look at the product appearance and details, experience the product performance, and send the ready-to-ship goods from the warehouse. (Products may have Chinese labels or Moenmedic trademarks)

  • 5-7 Days

    Print your LOGO on the product with the existing product colors. For small batches, adopt the UV transfer sticker scheme. For large batches, adopt processes that require plate making such as screen printing, custom fabric labels, and heat transfer labels.
    (We will design a product effect picture with your trademark and confirm it with you.)

  • 10-20 Days

    Plastic materials take 10 to 15 days. Fabrics in stock colors take 10 to 20 days. For fabrics not in stock, the lead time needs to be determined according to the dyeing time.

    Customize the product color (please provide the Pantone color number) and print your logo on the product.

1 of 3
  • Amazon

  • Shopify

  • Ebay

  • Walmart

  • Coupang

  • Rakuten

  • Lazada

  • Shopee

  • Aliexpress

  • Ozon

  • Jollychic

  • Wish

1 of 12
  • FDA Approved

  • 103 Chinese patents

  • US invention patent

  • Management system

1 of 4
  • Operations + Marketing

  • R&D + Procurement

  • Business Services

1 of 3

Contact form